Industrial And Commercial Flooring Applications Are Engineered To Withstand Extreme Conditions, Including Heavy Foot Traffic, Chemical Spills, And Heavy Machinery, Which Residential Floors Cannot Handle.
Surface Preparation
- Cleaning:Use A High-Pressure Washer Or Wire Brush To Remove Dirt, Grease, And Loose Particles From The Concrete Or Masonry.
- Repairs:Fill All Visible Cracks, Holes, And Honeycomb Surfaces With A Cementitious Repair Mortar Like Sika Monotop 122F Or Fixit Cracksil
- Smoothing:Fill “Bug Holes” And Ensure The Surface Is Flush. For Masonry Walls, Strike Joints Flush To Create A Smooth Substrate.
- Joint Treatment:Create A 75mm X 75mm Corner Fillet At The Junction Between The Wall And The Footing To Prevent Water Ingress At This Critical Point
- Priming:Apply A Primer If Required By The Manufacturer To Enhance Adhesion.
- Base Coat:Apply The First Coat Of Liquid Membrane Uniformly Across The Wall. For Sheet Membranes, Align And Apply In Sections Using A Roller To Achieve A Complete Bond.
- Reinforcement:Embed Reinforcing Tape Or Fabric At Corners And Joints While The First Coat Is Still Wet.
- Subsequent Coats:Apply At Least Two Coats, Ensuring Each Layer Cures Fully (Typically 3–24 Hours) Before The Next Application.