Traditional slope-forming waterproofing treatment for terraces and roof slabs.
- Base Preparation: After Laying The Plain Cement Concrete (PCC) Base, The Surface Is Cleaned And Leveled.
- Base Coat: A Layer Of Cement Mortar (Typically 1:4 Mix) Integrated With A Liquid Waterproofing Compound Is Applied.
- Stone Laying: Rough-Finished ShahabadOr Kota Stone Slabs (Typically 20–25mm Thick) Are Laid Over The Green Mortar.
- Grouting: The Joints Between The Stones Are Filled With A Cement Slurry Mixed With Waterproofing Compounds Until No Further Absorption Occurs.
- Final Layer: A Top Layer Of Cement Mortar Is Provided To A Specified Thickness (Often 15–20mm) And Cured By Ponding For At Least 7 Days.
